Dewatering Project – 11-Story Residential Building

Project Overview [table id=14 /] Project Description This construction dewatering for real estate project required excavation to depths ranging from 25’ – 35’ from surface the within a 16’ static water table. A 900 LF wellpoint dewatering system was installed in suspended segments to accommodate a staged excavation and remediation across the site. The initial system […]

Dewatering Project – 14-Story Office Building

  Project Overview [table id=13 /] Project Description A 1200 LF Wellpoint Dewatering System was installed in suspended segments to consider a staged excavation and remediation across the project site (a 14-floor commercial office building). The project required excavation to depths of 30’ from surface within a 24’ static water table. The system operates as two systems […]

Dewatering Project – Drainage Basin

Project Overview [table id=8 /] Project Description This 13-month dewatering project required excavation to depths of 20’ below ground surface within very complex soils, including fractured shale and varved clay lenses. A 2,500 LF Drilled Wellpoint Dewatering System was installed with segments being elevated up to 5’ above grade, and trenched up to 4’ below grade […]