Landfill Leachate Collection and Treatment System

Project Profile

  • Project Location : New York
  • Client Industry : Landfill (former)
  • Owner Industry : Contractor/Consultant
  • Gwtt Scope : Design, Build
  • Contract Value : $1.1M
  • Project Duration : 3 Months
  • Contaminants : VOCs
Download Project PDF

Project Narrative

GWTT was contracted to install a deep groundwater recovery system at a former landfill in New York. The system was designed to recover VOCs migrating from leachate into the down gradient groundwater. Sixteen recovery wells were installed with bottom loading pneumatic pumps. Individual discharge lines and secondary containment HDPE piping was piped and trenched to the treatment system. The well vaults were 5’ precast concrete vaults installed with a Bilco door over each recovery well. The entire length of trenching for this project was 3,020’.

 

GWTT constructed a treatment system to collect and treat the recovered water. The treatment system was prefabricated in a 40’ container box with heat, lights, and ventilation. All treatment components within the container were installed with secondary containment. The treatment system included a 550-gal double wall tank, custom air delivery manifold, water recovery manifold, bag filtration, duplex transfer pumps, submersible pump, 10 HP air compressor, and two 1,000 lb liquid phase carbon units.

The treatment system was designed and programmed to operate in batch production utilizing PLC and was outfitted with leak detection, pressure transmitters, pH transmitter, flow transmitter, and multiple level sensors. The system is controlled by a custom master control panel with a PLC, cellular telemetry, and VFDs for the transfer pumps. The treatment system discharge is first diverted to a 30,000-gal holding tank to verify treatment prior to being discharged to the sanitary system. GWTT coordinated and installed the power drop for the project.