Ash Landfill Storm Water Temporary Treatment System

Project Profile

  • Project Location : West Virginia
  • Owner Industry : Utility
  • Gwtt Scope : Design & Build
  • Contract Value : $500K
  • Project Duration : 12 Months
  • Contaminants : TSS, Aluminum, Iron, Arsenic, Selenium
Download Project PDF

Key Project Details

  • Installed a temporary treatment system to ensure discharge met permit limits during storm water reconfiguration project
  • Treatment parameters included As, Se, Al, Fe, pH, and TSS
  • System was designed to handle any combination of parameters, using filtration, activated carbon, pyrolusite media, and activated alumina

PROJECT CHALLENGES

  • System had to be designed to employ several different treatment technologies in various combinations, using valves and bypass piping to ensure treatment in the correct sequence
  • System was installed in an isolated area at an elevation of more than 3,500’, subject to persistent high winds and cold temperatures
  • Treatment was provided on an on-call basis
  • No reliable influent characterization data available prior to system design

Project Narrative

The ash landfill storm water temporary treatment system was installed to ensure that discharge permit limits were met for a broad range of constituents while a storm water management project was constructed. Treatment units included mechanical filtration for TSS, carbon treatment for aluminum, pyrolusite treatment for iron, and activated alumina treatment for arsenic and selenium. The system design, per client specification, needed to accommodate any combination of treatment units based on analytical results from the storm water equalization basins. In some cases, pH adjustment would be required prior to certain treatment units, then readjusted prior to discharge.

GWTT constructed the treatment system in environmentally controlled Conex boxes with multiple
valves, bypass piping, and manifolds to facilitate flexibility in the treatment process.