Project Profile
- Project Location : Iowa
- Client Industry : Contractor / Consultant
- Owner Industry : Utility
- Gwtt Scope : Design / Build / O&M
- Contract Value : $30M
- Project Duration : 24 Months
- Contaminants : TSS, pH, Iron, Aluminum
Download Project PDF
Key Project Details
-
>1,000 deep extraction wells for dewatering operations
-
4,000 GPM treatment system consists of coagulation / flocculation, pH adjustment, a 250,000-gallon clarifier, mechanical filtration, and eight 10,000-lb media vessels
-
GWTT designed, mobilized, constructed, and started up both systems
-
Ongoing 24/7 O&M services provided for the full life of the project to dewater and treat a 171-acre coal ash pond
PROJECT CHALLENGES
-
Busy project site with multiple sub-contractors requiring careful and coordinated planning and communication activities between all parties
-
Year-round project execution required continuous work through sub-freezing winter temperatures and summer peaks of >100F.
-
Ash excavation required dewatering system build and startup to meet aggressive deadline