Project Profile
- Project Location : Kentucky
- Client Industry : Contractor/ Consultant
- Owner Industry : Utility
- Gwtt Scope : Design & Build
- Contract Value : $1M
- Project Duration : 14 Months+
- Contaminants : Arsenic, TSS
Key Project Details
- Project includes decanting up to 100 million gallons of pond water, stormwater, and ash pore water
- Treatment for arsenic using oxidation and chemical precipitation will be implemented as necessary
- Treatment for TSS using coagulation/flocculation and sand filtration
- Treatment required to meet Kentucky Pollutant Discharge Elimination System (KYPDES) permit
PROJECT CHALLENGES
- Influx of stormwater into pond is delaying critical ash removal program, requiring large volume treatment capacity and creating high client visibility
- Pond inputs include plant discharges and stormwater runoff, creating non-filterable fine material that exceed discharge TSS limit
- Narrow shoreline and adjacent bedrock outcrops create limited space for treatment system, requiring additional engineering and design work
Project Narrative
GWTT was originally contracted to design and build a 250 GPM temporary treatment system to reduce arsenic in the pumped interstitial water during the remediation of a fly ash pond in Kentucky. In addition, a separate 1,000 GPM sand filtration system was provided to reduce Total Suspended Solids (TSS) during unwatering of the pond. Due to heavy rain events, the water level elevation in the pond was at an all-time high and space to install the system(s) was limited. Work
on the project was placed on hold until a solution could be developed. GWTT, working with the client, evaluated the site hydrology and conducted jar treatability tests using coagulants and flocculants to enhance the settling characteristics of the solids. The solution was to install a silt curtain within the pond to provide separation between the untreated and treated water.
A pump was used to move water from one side of the curtain to the other. A coagulant and flocculant were injected into the discharge piping of the pump to ensure proper mixing and floc formation. The heavier solids then had sufficient weight and time to settle in the treatment area of the pond. As a result, the treated pond water met the stringent discharge requirements, and the pond was dewatered at the rate of 3,000 to 5,000 GPM without further treatment. The pond water elevation was lowered, and the contractor was able to resume the project.
This in-situ approach provides high flow treatment rates with a small footprint, which saves the client a significant amount of money on the project by not requiring an ex-situ treatment system. The arsenic treatment and sand filtration systems will be implemented when the pond is dewatered and remedial activities resume.