Construction Dewatering and Treatment for Suspended Solids, VOCs

Project Profile

  • Project Location : Brooklyn, NY
  • Client Industry : Contractor/ Consulting
  • Owner Industry : Construction
  • Gwtt Scope : Operations & Maintenance
  • Contract Value : $1M
  • Project Duration : 12 Months
  • Contaminants : Suspended Solids, VOCs

Key Project Details

  • 44-story residential building in Brooklyn
  • Perimeter wellpoint system to dewater to general subgrade
  • Two local wellpoint/ deep well systems for elevator pits
  • Winterization for perimeter system
  • Treatment system included settling tank and carbon units

PROJECT CHALLENGES

  • Multiple systems operating simultaneously - full time GWTT operator to monitor performance.
  • Presence of organic layer at depth created vertical hydraulic gradient - installed deep wells to depressurize lower aquifer.

Project Narrative

This project included a high-rise residential tower with a basement in a geologically challenging environment. Two interior elevator pits were significantly below the general subgrade. The subsurface materials included urban fill, sand layers, an organic layer that functioned as a confining layer, and an underlying sand aquifer under confined conditions. The urban fill contained bricks, concrete, wood, and other materials that impeded drilling, requiring the use of sonic drills to complete the wellpoints. Dewatering the elevator pits required installing deep wells from the general subgrade and terminating in the underlying sand aquifer to depressurize the aquifer and prevent vertical recharge to the pits.

Because the site had been used for industrial purposes prior to redevelopment the dewatering effluent required treatment prior to discharge under a NPDES permit.