Project Profile
- Project Location : New Jersey
- Owner Industry : Contractor/Consultant
- Gwtt Scope : Design, Build, Site Civil Work
- Contract Value : $0.9M
- Project Duration : 8 Months
- Contaminants : Chlorinated Solvents
Key Project Details
- Trenching and Installation of more than 1,500’ of double walled HDPE groundwater conveyance piping
- Construction of a 4” force-main and discharge outfall
- Installation of instrumentation and controls
- Installation of 40’ x 60’ concrete foundation
- Construction of a pre-engineered building to house treatment system components
PROJECT CHALLENGES
- Project location required extensive coordination with local utility companies to mark off and avoid water, electrical, and sewer infrastructure
- Project execution spanned winter and early spring, which required modification of the task timeline to protect sensitive equipment and materials
- Multiple client-requested change orders-imposed challenges for project milestones and completion schedule
Project Narrative
GWTT was selected as the building and mechanical contractor for the design/build and installation of
a groundwater recovery and treatment system. The project involved the installation of a 40’ x 60’ concrete foundation and a custom “carriage house” style pre-engineered building to house the treatment system components, which included an oil/water separator, two 4,000-gal equalization tanks, low profile air stripper, bag filtration, and liquid and vapor-phase granular activated carbon units.
GWTT installed a new potable water service to the building in addition to a new 200-amp electrical
service to supply power to the treatment system components. The site civil work included trenching and installation of over 1,500’ of double-walled HDPE groundwater conveyance piping from two extraction wells to the treatment building. A 4” force-main and discharge outfall were constructed to facilitate the discharge of treated groundwater to a nearby stream.