Landfill Leachate Modular Treatment System

Project Profile

  • Project Location : Maryland
  • Client Industry : Landfill
  • Owner Industry : Contractor/Consultant
  • Gwtt Scope : Design, Build
  • Project Duration : 12 Months
  • Contaminants : TSS, Arsenic, Selenium
Download Project PDF

Key Project Details

  • Designed a modular treatment plant
  • System design treated selenium effluent to 5 ppb and arsenic to 150 ppb
  • System design treated TSS to 35 ppm
  • Scope of services included: engineering, procurement, fabrication, site preparation, system installation, and startup / commissioning
  • Full system automation was delivered via PLC integration
  • Treatment system was delivered with zero loss-time incidents

PROJECT CHALLENGES

  • Highly variable weather conditions required a fully winterized system enclosure comprised of four integrated shipping containers
  • Discharge requirement for selenium was changed post-design, so the system had to be reconfigured to use a new type of filtration media
  • Client-requested system change resulted in higher iron precipitation than original design, requiring adjustment to the treatment process
  • Despite multiple mid-stream design changes, the project was delivered on time and within budget

Project Narrative

GWTT was contracted to provide a 75 GPM program including engineering, procurement, fabrication, testing, delivery and installation, along with leachate pond collection equipment and piping, discharge install, and equipment startup and commissioning. A performance test was also included.
The system was designed to meet an effluent discharge requirement of 35 ppm TSS, 5 ppb selenium, and 150 ppb arsenic at an influent rate of 75 GPM. The system was automated with a fully integrated PLC and HMI package capable of remote viewing. The total system was installed inside four shipping containers, two of which were modified to remove the adjacent walls and increase the open footprint. Treatment components included sand filters, pH adjustment tanks, bag filters, zero-valent iron reactors, a clarifier, and solids handling system. The treated water was discharged to the Potomac River.

Work was completed on schedule, within budget, and without a loss-time or environmental incident.