MGP Sludge Dewatering and Water Treatment System

Project Profile

  • Project Location : Rhode Island
  • Client Industry : Utility
  • Owner Industry : Contractor/Consultant
  • Gwtt Scope : Design, Build, O&M
  • Contract Value : $550K
  • Project Duration : 4 Months
  • Contaminants : VOCs (benzene) and SVOCs (naphthalene), metals, and cyanide: many at high concentrations
Download Project PDF

Key Project Details

  • Worked as part of an elite contractor team to complete project on time and within budget
  • Installed water treatment system including sludge dewatering component on a design, build, rent, and operate basis
  • Conducted all bench scale testing to determine appropriate chemicals and dosing to dew
  • Performed work in level C PPE, as necessary

PROJECT CHALLENGES

  • Treated water to meet sewer authority limitations for VOCs, SVOCs, and metals
  • Treated several million gallons of contact water to expose tank bottom sludge for removal
  • Dewatered approx. 1M gallons of MGP sludge
  • Dewatered sludge to allow for off-site transportation and disposal of minimal volume

Project Narrative

Often times it is desirable to dewater these sludges to reduce the volume of material requiring off-site disposal. During the remediation project to remove MGP sludge from two former gas holders prior to demolition, GWTT was responsible for the design, installation, operation, and removal of a turnkey sludge management system with a water treatment component that allowed treated effluent to be discharged to the local sewer system. A belt filter press was utilized to maximize the sludge dewatering process rate. Moreover, water for the belt wash operations was recycled from the effluent of the treated water, eliminating the need to use the public water supply. This reduced overall treated water discharge volumes from the project.

GWTT successfully reduced sludge volumes on site, minimizing waste disposal costs.