Project Profile
- Project Location : Maine
- Client Industry : Federal Base (former)
- Owner Industry : Contractor/Consultant
- Gwtt Scope : System Design, Build, Startup
- Contract Value : $165K
- Project Duration : 3 Months
- Contaminants : PFAS
Key Project Details
- Assisted with final design of supplemental PFAS treatment equipment to be installed inside the building of an existing treatment system
- Assisted with final selection of the most effective PFAS removal media
- Fabricated equipment
- Installed and integrated new PFAS treatment equipment with existing treatment equipment
- Integrated new electric and controls
- Conducted field startup/prove out
- Managing future media changes outs
PROJECT CHALLENGES
- Expedited project schedule from award to completion
- Overcame accelerated schedule by using GWTT standard rental inventory as basis for design
Project Narrative
GWTT was contracted to assist with design, build, and startup/prove out of PFAS treatment equipment to be installed and integrated into an existing permanent treatment system building at a former Navy base in Maine. The system was designed to reduce PFAS concentrations of construction dewatering water prior to it being introduced into the existing permanent treatment system.
GWTT shipped and installed a 21,000-gallon holding tank outside of the existing treatment system building and integrated new sediment filtration, transfer pumps and PFAS media vessels inside the existing treatment plant. Additionally, we upgraded existing electric and controls infrastructure to integrate the new equipment.