Recirculation Water Conveyance and Injection System: Chlorinated Solvents

Project Profile

  • Project Location : New Jersey
  • Client Industry : Former Paint Manufacturer
  • Gwtt Scope : Fabricate & Build
  • Contract Value : $1.1M
  • Project Duration : 4 Months
  • Contaminants : Chlorinated Solvents (TCE and PCE)
Download Project PDF

Key Project Details

  • Fabricated Mobile Injection Unit (MIU) trailer
  • Installed conveyance for 30 injection wells, 24 extraction wells, well heads, pumps, and connections
  • Installed electrical power drop, connections, and instrumentation
  • Operator training, mobilization, and demobilization services
  • Supervised/worked with union labor and operators

PROJECT CHALLENGES

  • Winter conditions
  • Coordination with different contractors with overlapping scopes of work

Project Narrative

GWTT was contracted to provide remediation construction services at a former paint manufacturing site in support of an existing water treatment plant for the contamination of chlorinated solvents (TCE and PCE). GWTT completed the construction of a recirculation water conveyance and delivery infrastructure system, which included the fabrication of a trailer enclosed Mobile Injection Unit (MIU). Throughout the winter, GWTT worked with union labor and operators to run double contained HDPE piping from 24 extraction wells to the existing treatment plant, single walled piping from the treatment plant to the MIU, and coiled piping from the MIU to 30 injection wells. GWTT also installed four power poles and the necessary wiring for the MIU’s power drop.

The system’s recovery wells pumped water through the conveyance piping to the existing treatment system on site. After that water was treated, it was brought to the MIU injection trailer for chemical mixing and injection into the 30 wells. The GWTT-fabricated MIU operated in concert with the extraction wells at a rate of 40 GPM. GWTT trained the operators, as well as provided site preparation, site restoration, and demobilization.