Temporary Industrial pH Adjustment Wastewater Treatment System

Project Profile

  • Project Location : Milford, MA
  • Client Industry : Industrial Manufacturing
  • Owner Industry : Contractor/Consultant
  • Gwtt Scope : Design, Build, Installation
  • Contract Value : $150K
  • Project Duration : 3 Months
  • Contaminants : pH Adjustment
Download Project PDF

Key Project Details

  • Installed 600 linear ft of PVC conveyance piping consisting of an influent, effluent, and sludge return line
  • Designed, built, and installed a 25gpm pH adjustment wastewater treatment system housed in a 40ft conex box
  • Adjusted pH of influent wastewater (1-3 pH) to achieve discharge limits

PROJECT CHALLENGES

  • Low influent pH
  • Complex chemical and polymer mixing
  • Implemented multiple pH sensors and closing pumps, each with different functions

Project Narrative

GWTT was contracted to design, build, and install a temporary industrial pH adjustment wastewater treatment system at an industrial manufacturing facility in MA. The system was designed to adjust low pH (pH of 1-3) influent wastewater to achieve the facilities discharge limits.

GWTT custom fabricated and installed a system to treat the wastewater. GWTT also installed a total of approximately 600 linear feet of PVC conveyance piping for the system consisting of an influent line, effluent line, and sludge return line. This piping conveyed wastewater to and from the appropriate locations at the facility.

The treatment system includes mix tanks, mixers, transfer pumps, chemical dosing pumps, pH sensors & controls, a control panel with alarms, and all associated gauges, sample ports, & meters. The influent wastewater first enters a large two chamber mix tank where chemicals and polymers are added. It then enters a clarifier where solids settle out. Then water is pumped to a final mix tank where pH is neutralized and pumped back to the discharge location.